Aller au contenu principal
Home

Pour offrir aux visiteurs, une expérience fluide et complète, nous recommandons une connexion sur un autre navigateur (Mozilla, Chrome, ...).

  • S'inscrire
  • Se connecter
  • Espace candidat
  • Se déconnecter
  • FR
  • EN
  • DE
  • Nous connaître
    • Le groupe
    • Nos valeurs
    • Votre carrière
  • Nos métiers
    • Achat & Logistique
    • Audit & Conseil
    • Commerce & Développement
    • Développement Durable & QHSE
    • Etudes, R&D, Innovation
    • Exploitation & Maintenance
    • Fonctions Transverses
    • Informatique & Télécom
    • Matériel & Equipement
    • Travaux
  • Les opportunités
  • Une question ?
    • Rencontrez-nous
  • Je suis étudiant(e)

Fil d'Ariane

  1. Accueil
  2. node
  3. Assistant Engineer H/F
< Revenir à la liste

Assistant Engineer H/F

  • Encadrement
  • Stage
  • Bouygues Travaux Publics
  • France

Partagez cette offre

Postulez en 1 clic Voir mes favoris

Fil d'Ariane

  1. Accueil
  2. node
  3. Assistant Engineer H/F

Vos missions & challenges

The Trunk Road T2 is part of the strategic road network development of Route 6 in Hong Kong, that also includes Central Kowloon Route (CKR) and Tseung Kwan O – Lam Tin Tunnel (TKO-LTT). The overall project will give an east-west express link between West Kowloon and Tseung Kwan O and relieves the existing heavily utilized road network. Trunk Road T2 project is a 16 billion Hong Kong dollars contract for Civil Engineering Hong Kong’s Development.
The scope of the Trunk Road T2 project includes :


• Tunneling works : a dual two-lane trunk road of 3.4km long, including Depressed Road (0.29km), Cut-and-Cover Tunnel (0.1km) at South Apron, 2.4km Sub-Sea TBM tunnel under the Kwun Tong Typhoon Shelter and Victoria Harbor, Drill-and-Break Tunnel and Drill-and-Blast Tunnel (0.4km) and a hard-rock TBM tunnel (0.48km) between Cha Kwo Ling Landfall and Lam Tin Interchange.


• Civil works : Launching shaft, West Ventilation Building (WVB), East Ventilation Building (EVB)


• Infrastructure Works : Developments at the Former South Apron including civil, structural, E&M and landscape works

Under the responsibility of the TBM manager and the senior production engineer, we offer a training as assistant site engineer for the hard-rock TBM activities. All the hard-rock TBM activities will be concentrated in 2023, as a crucial acceleration measure of the project.

Activities :

  • Organization and follow-up of cutter-tools refurbishment workshop, including set-up phase, materials and labor management
  • Organization and follow-up of cutter-head maintenance activities
  • Daily excavation activities follow-up and improvements
  • Involvement in logistic, procurement and delivery process

Et si c'était vous ?

Profile :

  • Engineering student (final training or gap year)
  • Good communication skills, with several interlocutor and interfaces
  • Adaptative behavior
  • Motivated to work on site

Détails

Expérience

Etudiant

Temps de travail

Temps plein

Durée de contrat

6 months

Statut

ETAM

En complément, vous bénéficierez de :

Une intégration sur-mesure

Une offre de formation innovante, construite dans une logique de parcours

Une politique mobilité attractive

Une rémunération dynamique

Une épargne salariale Groupe

Des dispositifs complémentaires : Mutuelle, Prévoyance, Comité d'Entraide, Action Logement, etc

Ces éléments s’appliquent partiellement ou en totalité selon le type de contrat et votre localisation.

Alert job form

  • bouygues
  • Certification Top Employer
  • Diversité
  • Happy trainees 2021

Footer

  • Le site du groupe
  • Le blog
  • Contact
  • Mentions Légales
  • Accessibilité

Recherche

Créez votre espace candidat ou connectez-vous pour activer l'alerte mail.

Entrer un email de type exemple@exemple.fr
Entrer le mot de passe associé au compte
Mot de passe perdu ?