Your future duties & challenges
Presentation of the project :
The Rockhampton Ring Road project is situated near the town of Rockhampton. Within the scope of the project is the Fitzroy River Bridge which will be a match-cast segmental balanced cantilever structure. VSL’s expected involvement in the project is the casting and erection of the ~350 match-cast segments of the Fitzroy River Bridge.
Missions :
Short-term: start playing a role in the project technical team to participate in the planning and development of construction methodology in advance of the works (technical/methodological phase)
Long-term: with the start of site work, we would look to transition the candidate into a site engineering role for production works in either the match-casting or the erection works teams.
So why not you?
- Junior engineer
- Basic background in structures construction
- Interest in developing experience in bridge construction techniques
- Be technically minded with good university results in structural and mechanical subjects
- Experience with Microsoft Project or Primavera
- Good communication skills
- Good level of english required
Details
Experience level
Status
In addition, you’ll benefit from:
Personalised induction
Innovative training possibilities based on progressive logic
An attractive mobility policy
A dynamic salary
The Group’s employee savings scheme
Additional benefits: Top-up health insurance, retirement plan, peer support committee, housing scheme, etc.
These items apply fully or partially depending on the type of contract and your location.